Sistemde güncelleme ve geliştirme çalışmaları devam etmektedir

Staff tasks based shift scheduling problem solution with ANP and goal programming method in a natural gas combined cycle power plant

Yayın

Staff tasks based shift scheduling problem solution with ANP and goal programming method in a natural gas combined cycle power plant

01 Ocak 2019 Makale Google Scholar

Atıf kopyala

P. E. ÖZCAN (2019). Staff tasks based shift scheduling problem solution with ANP and goal programming method in a natural gas combined cycle power plant. *Mathematics 7 (2), 192-218, 2019*.

Yayın bilgileri

Dergi Mathematics 7 (2), 192-218, 2019
Veri tabanı Google Scholar
Kaynak GoogleScholar

Atıf verisi 13 Kasım 2026 tarihinde güncellendi.

EH Özder, EC Özcan, T Eren | Mathematics 7 (2), 192-218, 2019

Kaynak bazlı atıf

Kaynak Atıf
Google Scholar 69
Etkin 0

Yayın metrikleri (GS / WoS / Scopus)

69 Google Scholar Atıf
AI Asistan
Çevrimiçi